The Mirpur-10 metro rail station is set to resume operations from today, almost three months after it was vandalised and consequently shut down in July.
Most of the damaged equipment have already been replaced with equipment from two other relatively less-used stations
The Mirpur-10 metro rail station is set to resume operations from today, almost three months after it was vandalised and consequently shut down in July.
Most of the damaged equipment have already been replaced with equipment from two other relatively less-used stations