Our Correspondent, Patuakhali
At least 647 kilometres of roads under the Local Government Engineering Department (LGED) in Patuakhali have become unfit for use due to years of neglect, causing immense suffering to commuters.
An embankment built across the Boritala River at Gabbaria in Patuakhali’s Kalapara upazila has blocked the natural water flow, leaving vast areas waterlogged.
This year, fishermen have been returning with lesser catches and bigger losses.
Plaster is falling off the walls of a newly constructed four-storey academic building at Modhya Bogura Nuria Dakhil Madrasa in Patuakhali’s Dashmina upazila, raising questions about the quality of the construction work.
Without pontoons at several launch ghats in the coastal upazilas of Rangabali, Galachipa, Dashmina, and parts of Bauphal in Patuakhali, passengers face serious hazards while boarding and disembarking vessels.
At least 18 illegal dams built by influential locals for fish farming along the three-kilometre-long Vaila Canal in Patuakhali Sadar upazila are causing severe waterlogging in the surrounding area, affecting around 1,500 acres of farmland and several hundred households.
Even light rain brings classes to a halt, teachers say
An embankment in the Karamjatala area of Patuakhali’s Kalapara upazila, repaired at a cost of Tk 1.5 crore only seven months ago, has partially collapsed into the Rabnabad River following tidal surges over the last two days.
At least 647 kilometres of roads under the Local Government Engineering Department (LGED) in Patuakhali have become unfit for use due to years of neglect, causing immense suffering to commuters.
An embankment built across the Boritala River at Gabbaria in Patuakhali’s Kalapara upazila has blocked the natural water flow, leaving vast areas waterlogged.
This year, fishermen have been returning with lesser catches and bigger losses.
Plaster is falling off the walls of a newly constructed four-storey academic building at Modhya Bogura Nuria Dakhil Madrasa in Patuakhali’s Dashmina upazila, raising questions about the quality of the construction work.
Without pontoons at several launch ghats in the coastal upazilas of Rangabali, Galachipa, Dashmina, and parts of Bauphal in Patuakhali, passengers face serious hazards while boarding and disembarking vessels.
At least 18 illegal dams built by influential locals for fish farming along the three-kilometre-long Vaila Canal in Patuakhali Sadar upazila are causing severe waterlogging in the surrounding area, affecting around 1,500 acres of farmland and several hundred households.
Even light rain brings classes to a halt, teachers say
An embankment in the Karamjatala area of Patuakhali’s Kalapara upazila, repaired at a cost of Tk 1.5 crore only seven months ago, has partially collapsed into the Rabnabad River following tidal surges over the last two days.
At least 17 hazardous bends along a 37-kilometre stretch of the Patuakhali-Kuakata highway -- between Shakaria and Bandra in Barguna’s Amtali upazila -- have become death traps for commuters, with dozens killed and hundreds injured in recent months.
The Payra sea port is being developed under a master plan, and one of the new features is scheduled to be operational by July 2026, said the Payra Port Authority (PPA) yesterday...The port will enable transshipment for up to 15 commercial vessels simultaneously, said PPA Member (Engi