Padma Bridge River Training Works

Padma Bridge project: River training to be dearer

The cost of the Padma Bridge River Training Works (RTW) is likely to increase further as additional areas have been brought under the RTW beyond the original plan due to excessive erosion of the river banks.

May 4, 2016
May 4, 2016

Padma Bridge project: River training to be dearer

The cost of the Padma Bridge River Training Works (RTW) is likely to increase further as additional areas have been brought under the RTW beyond the original plan due to excessive erosion of the river banks.