The Chittagong Port Authority (CPA) will operate its New Mooring Container Terminal for the next six months or until a new operator is chosen.
A vessel with 10 metres draught berthed at a jetty of the Chattogram port for the first time yesterday, a major leap forward as the movement of larger ships is expected to cut costs and save time.
The Chittagong Port Authority (CPA) will operate its New Mooring Container Terminal for the next six months or until a new operator is chosen.
A vessel with 10 metres draught berthed at a jetty of the Chattogram port for the first time yesterday, a major leap forward as the movement of larger ships is expected to cut costs and save time.